Gordon Reserve - Final Concept Design
ENGAGEMENT UPDATE
The information collected from the community engagement stages has assisted the City of Bayswater to develop a final concept design based on a mixture style of play equipment.
The below table identifies the outcome from the 9 surveys completed before the closing date of 13 December 2017.
The community requested that the following options are considered within the overall concept design;
- Swing, Climb and Slide are the community's top three preferred style of activities
- The community advised that they prefer sand soft fall compared to mulch.
Based on the community's feedback the final design has been developed and available here
Please note that work to replace the playground equipment at Gordon Reserve is scheduled to commence April 2018 to be completed by June 2018.
If you wish for further information, please contact the City on 9272 0970 or email trent.prior@bayswater.wa.gov.au.
Consultation has concluded