Chesney Reserve - Final Concept Plan

Engagement Update

The City received 9 completed surveys during the final stage of community consultation in relation to the Chesney Reserve playground replacement. The information collected from the community engagement process then assisted the City to develop a final concept design based on a mixture style of play equipment.

The community also requested that the following options be considered within the overall concept design:

  • Equipment to be suitable for children aged between 0 - 12 years

  • Swing, Climb and Slide are the community's top three preferred style of activities

  • Would like to see additional benches near the playground

  • Prefer sand soft fall compared to mulch

Based on the community's feedback, the final design has been developed and is available by clicking here.

Please note that it is anticipated that Chesney Reserve playground will be installed between January-March 2019.

If you wish for further information, please contact the City on 9272 0970 or email nina.fehlberg@bayswater.wa.gov.au


Share Chesney Reserve - Final Concept Plan on Facebook Share Chesney Reserve - Final Concept Plan on Twitter Share Chesney Reserve - Final Concept Plan on Linkedin Email Chesney Reserve - Final Concept Plan link

Consultation has concluded

<span class="translation_missing" title="translation missing: en.projects.blog_posts.show.load_comment_text">Load Comment Text</span>